RAAF Base Tindal – EO Storage – Climate Control (2018-2019)

In 2017, Johnny Cool were awarded the electrical and mechanical services contract by Sitzler for updates to the RAAF Base Tindal – EO Storage – Climate Control. 

These works included the supply of all plant and materials for the installation of; Pillar units, Distribution switchboard, New power supply to A/C units, Lightning protection, new Actron AC units and associated controls as well as the supply and installation of all Ductwork including required supports, penetrations, weatherproofing (all manufactured by Johnny cool 'in-house'). 

The works were succfessuly handed over in 2018 with defect liabilty period ending in February 2019. 